Summer Drill Program Commences September 10thFocus on 5 km Long Conductor Corridor with Unconformity MineralizationMultiple Priority Targets to be Tested with 2,400 Metre Drill ProgramCanAlaska Uranium Ltd. is pleased to announce JV partner Denison Mines Corp. will be starting a 2,400 metre summer drilling program at the Moon Lake South JV project . The project is operated by Denison and the 2021 drilling program is …
Summer Drill Program Commences September 10th
Focus on 5 km Long Conductor Corridor with Unconformity Mineralization
Multiple Priority Targets to be Tested with 2,400 Metre Drill Program
CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQB: CVVUF) (FSE: DH7N) (“CanAlaska” or the “Company”) is pleased to announce JV partner Denison Mines Corp. (“Denison”) will be starting a 2,400 metre summer drilling program at the Moon Lake South JV project (Figure 1). The project is operated by Denison and the 2021 drilling program is scheduled to begin around September 10th. CanAlaska holds a 25% ownership in the project and will fund the Company’s share of the 2021 exploration program.
Figure 1
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2864/95918_31eeea1ce47529a8_001full.jpg
In January 2016, Denison entered into an option agreement with CanAlaska to earn a 75% interest in the Moon Lake South project. The project contains a 5 km long conductor corridor known as the CR-3 conductor (Figure 2), which is located approximately two...
Read Full Story: https://investingnews.com/news/uranium-investing/canalaska-denison-mines-jv-to-drill-moon-lake-south/
Your content is great. However, if any of the content contained herein violates any rights of yours, including those of copyright, please contact us immediately by e-mail at media[@]kissrpr.com.